Skip to content

Resource Center

Seal the Deal: Fixing Leaks with a Simple O-Ring Swap on a Nature 2 Chlorine Side

A secure, leak-free seal is key to keeping your Pro Vision system running smoothly. In this tutorial, we’ll walk you through how to replace the O-ring on the chlorine side of your system—an easy maintenance task that helps prevent leaks and ensures peak performance.

Resource Details

Key Takeaways:

1. Properly sealing your Pro Vision system prevents costly water loss and damage. 

2. Aligning the cap and receiver correctly is critical for a proper fit. 

3. Replacing the O-ring is a quick, affordable step that keeps your system working efficiently. 

Step-by-Step Process:

1. Turn off the pump and, if available, close the shutoff valves on either side of the system to prevent water loss. 

2. Turn the large collar counterclockwise to remove it, then take out and discard the old O-ring. 

3. Seat the new O-ring in the groove on top of the unit, making sure it’s positioned evenly. 

4. Align the V-Pack receiver’s two holes front to back. 

5. Match the oval cutout on the cap’s black portion with the front of the V-Pack receiver, and the left cutout with the notch on the left side of the receiver. 

6. Insert the cap, push down, and tighten by turning clockwise until secure.

Related Products

Related Resources